top of page

Aeby & Perneger Associés SA

Tour C3 
MEYRIN, SWITZERLAND.

under construction

serge grard bureau d'architecture
Residence Sous-le-Château
Hauterive (NE), Switzerland

constructed

EQUIPE

Giovanni Conca (project manager)

WHAT

Housing

Area: 4’350 m2
Volume SIA 416: 10’480m3

CUSTOMER

MICHEL WOLF SA

WHEN

2018-2022

The village of Hauterive lies at the foot of Chaumont Mountain and has been known since ancient times for its quarries of yellow limestone (known as Hauterive stone), which was widely used in the construction of the city of Neuchâtel and was still being quarried until recently. Not far from the 15th-century Hauterive Castle, the four new residential buildings are set in a particularly sensitive historical and landscape context. In an effort to mitigate the inevitable impact of the buildings, their height was kept below that permitted by building regulations, in order to preserve the view of the old buildings and vineyards behind them as much as possible.

The three 17th-century wine-making buildings located upstream, which had already been converted for residential use, were also modernised. The front garden was

The front garden was maintained and the old retaining wall was rebuilt using the characteristic yellow stone of Hauterive.

bottom of page